GLNG DataWeb Home
Search for another PBS Observation
PBS Observation Checklist
Observer:
Garry Parsons
Vessel
Quandamooka
Bruce
Area:
Engine room
Date
Time
Task Observed
Install and remove main engine tail shaft
Number of people observed?
1
2
3
Contractor:
Nil
Categories/Behaviours
Safe
At Risk
N/A
Observation-include exactly what you saw
Employee Response / Action Taken
1.0 Body Mechanics
1.1 Keeping eyes on Job/Path
1.2 Lift/Pulling/Pushing/Heaving
Use slings and 2 people to lift tail shaft
1.3 Line of fire/Danger
Dropping tail shaft on hand or foot
1.4 Use of handrails
1.5 Three Points of contact - Ladders
1.6 Body position/Stretching/Straining
Good footing no trip hazards backs strait
2.0 PPE
2.1 Basic PPE (Long Pant, Long Sleeves)
2.2 UV Protection
2.3 Wearing Eye Face Protection
2.4 Using Foot Protection
2.5 Wearing Hand Protection
2.6 Using Hearing Protection
2.7 Using Task Specific Body Protection
2.8 Wearing Head Protection
2.9 Using Respiratory Protection
2.10 Wearing PFD's
3.0 Job Factors
3.1 Effictive Communication (Radio's Horns Bells)
3.2 Shortcuts Haste
checked
3.3 Adherence to procedures
3.4 PreStart/Restart meetings conducted as required
3.5 Seamanship Practices
3.6 Situational Awareness
3.7 Access and Egress
4.0 Tools and Equipment
4.1 Effictive Communication (Radio's Horns Bells)
4.2 Shortcuts Haste
4.3 Adherence to procedures
5.0 Housekeeping
5.1 Material Storage
5.2 Storage of Hazardous Materials
5.3 Waste Management
5.4 Vessel Cleanliness
6.0 Health Awareness
6.1 Insect Vectors
6.2 Hydration Provisions
6.3 Sun Protection
6.4 Fitness for Work
6.5 Personnel Hygiene
7.0 Environment
7.1 Effuent Removal
7.2 Rubbish Disposal
Shore facility
Shore facility
7.3 Oil Chemical Spills
7.4 Marine Species in Vessel Vacinity
Behaviour Number
Additional Information
1
2
3
4
5
Comments
Authorisationn Code